Close Menu
21stNews21stNews

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Rodrygo sidelined with injury, deepening Real Madrid’s crisis

    February 7, 2026

    Portuguese Tourist Arrivals to Morocco Jump Over 35% in 2025 Portuguese Tourist Arrivals to Morocco Jump Over 35% in 2025

    February 7, 2026

    En-Nesyri Faces Early Al-Ittihad Fans Criticism After Quiet Debut

    February 7, 2026
    Facebook X (Twitter) Instagram
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms and Conditions
    Pinterest Facebook LinkedIn
    21stNews21stNews
    • Home
    • Moroccan News
    • Industry & Technologies
    • Financial News
    • Sports
    Subscribe
    21stNews21stNews
    Home»Financial News»Spain-Morocco Tunnel Will Not Be Ready for 2030 World Cup
    Financial News

    Spain-Morocco Tunnel Will Not Be Ready for 2030 World Cup

    By January 25, 20263 Mins Read
    Share Facebook Twitter Pinterest LinkedIn Tumblr Reddit Telegram Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Marrakech – Bad news has emerged for Spain and Morocco as the ambitious tunnel project linking both continents will miss the 2030 World Cup deadline.

    According to Spanish news outlet AS, German company Herrenknecht has confirmed the project remains technically viable long-term but cannot be completed by 2030. The railway tunnel beneath the Strait of Gibraltar represents the first physical connection between Europe and Africa.

    The study commissioned by the Spanish Company for Studies on Fixed Communication across the Gibraltar Strait (SECEGSA) and conducted by Herrenknecht, a world leader in tunnel boring machines, concludes that the infrastructure cannot become operational before 2035 or 2040. This timeline eliminates any possibility of service beginning for the 2030 World Cup.

    Herrenknecht confirms the tunnel’s technological viability while warning about geological complexity in the Strait, particularly at the Camarinal threshold. These conditions require longer exploration and drilling phases than initially anticipated.

    The delay carries implications beyond engineering concerns. Spain, Morocco, and the European Union consider this infrastructure strategically valuable for transforming continental freight flows and strengthening European positioning in a corridor where global powers converge.

    The fixed connection would integrate Morocco into the European railway network, create a continuous logistics corridor between Madrid, Rabat, and Casablanca, and reinforce the Mediterranean’s two shores’ role as strategic gateways between the continents

    These advantages will not materialize in the short term. Morocco, meanwhile, is accelerating railway modernization and deepening alliances with the United States, France, and Israel. The Iberian platform describes this trajectory in implicit alarmist terms, exposing deep-seated fears in Madrid over Rabat’s rising strategic weight and the erosion of Spain’s traditional leverage.

    Read also: Spain Tasks Ineco with Designing First Morocco Tunnel After Viability Study

    The Strait of Gibraltar remains one of the world’s most sensitive maritime passages, named after Ṭāriq ibn Ziyād, the Amazigh commander whose 711 crossing from North Africa into Europe permanently inscribed the strait into geopolitical history.

    If realized, the infrastructure would have significantly enhanced strategic connectivity and deepened security cooperation, including submarine monitoring, maritime domain awareness, and the protection of critical cross-border infrastructure.

    The confirmed delay compels Spain and the EU to sustain a security architecture centered on naval and air dominance in the Strait, intensified surveillance against hybrid and cyber threats, and close coordination with NATO allies – with Morocco remaining a pivotal partner in regional stability and deterrence.

    Herrenknecht’s report stresses that geological rather than technological obstacles present the main challenge. Flysch formations, seabed instability, and route depth require preliminary exploratory tunnels, advanced seismic studies, and specially adapted tunnel boring machines.

    The Spanish project side already exceeds €8.5 billion, with costs potentially increasing as studies advance and technical solutions develop. Financing depends on European funds, state contributions, and possible logistics and telecommunications service revenues.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous ArticleDirham Strengthens Against US Dollar As Market Liquidity Improves
    Next Article GNV to Strengthen Maritime Connections Between Spain, Morocco

    Related Posts

    Financial News

    Portuguese Tourist Arrivals to Morocco Jump Over 35% in 2025 Portuguese Tourist Arrivals to Morocco Jump Over 35% in 2025

    February 7, 2026
    Financial News

    Minor Injury Delays Zabiri’s Rennes Debut

    February 7, 2026
    Financial News

    Over 154,000 People Evacuated as Rescue Operations Continue

    February 7, 2026
    Top Posts

    How Google Gemini Helps Crypto Traders Filter Signals From Noise

    August 8, 202524 Views

    DC facing $20 million security funding cut despite Trump complaints of US capital crime

    August 8, 202521 Views

    DeFi Soars with Tokenized Stocks, But User Activity Shifts to NFTs

    August 9, 202520 Views
    News Categories
    • AgriFood (105)
    • Financial News (1,333)
    • Industry & Technologies (1,246)
    • Moroccan News (1,287)
    • Sports (1,314)
    Most Popular

    Saudi Arabia Suspends Contracts With 1,800 Foreign Umrah Travel Agencies Saudi Arabia Suspends Contracts With 1,800 Foreign Umrah Travel Agencies

    February 3, 20263 Views

    Tangier-Tarifa Ferry Links Suspended Due to Storm Leonardo

    February 2, 20263 Views

    Severe Weather Alert as Snow, Heavy Rain Hit Morocco

    February 1, 20263 Views
    Our Picks

    Watch These Key Bitcoin Metrics as BTC Price Prepares for ‘Big Move’

    October 1, 2025

    Who is Anish Dayal Singh? Former CRPF and ITBP DG appointed as deputy National Security Advisor

    August 24, 2025

    Tim Cook explains why Apple is investing heavily in Corning’s glass factory

    September 13, 2025

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    • Home
    • About Us
    • Privacy Policy
    © 2026 21stNews. All rights reserved.

    Type above and press Enter to search. Press Esc to cancel.

    Go to mobile version