Close Menu
21stNews21stNews

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Morocco’s Parliament Opens Spring Session Ahead of Elections, Government Review

    April 11, 2026

    Moroccans Rank Second Among Foreign Homebuyers in Spain

    April 10, 2026

    FIFA’s Snub of Jacques Ndala Is Tacit Vindication of Morocco in AFCON Controversy

    April 10, 2026
    Facebook X (Twitter) Instagram
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms and Conditions
    Pinterest Facebook LinkedIn
    21stNews21stNews
    • Home
    • Moroccan News
    • Industry & Technologies
    • Financial News
    • Sports
    Subscribe
    21stNews21stNews
    Home»Financial News»Spain, Morocco Move Closer to Building Strait of Gibraltar Tunnel
    Financial News

    Spain, Morocco Move Closer to Building Strait of Gibraltar Tunnel

    By April 10, 20264 Mins Read
    Share Facebook Twitter Pinterest LinkedIn Tumblr Reddit Telegram Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Marrakech – Spain and Morocco have taken a major step toward building a submarine tunnel under the Strait of Gibraltar. A memorandum of understanding (MoU) was signed between Spain’s National Geographic Institute and Morocco’s National Center for Scientific and Technical Research (CNRST) to conduct joint research on the seismicity and geodynamics of the strait.

    Spanish Transport Minister Óscar Puente and his Moroccan counterpart, Karim Zidane, met on December 4, 2025 at La Moncloa to formalize the agreement. The project has been under study for nearly half a century, since the two countries first committed to exploring a fixed link between Europe and Africa.

    Spanish outlet OKDiario reported on Thursday that the Spanish government approved in mid-March 2026 a new transfer of €1.73 million to finance technical studies for the infrastructure. The project is reportedly being developed through SECEGSA, the Spanish Company for Studies on Fixed Communication across the Strait of Gibraltar, a public company created in the 1980s to advance the tunnel’s construction.

    The planned tunnel would stretch approximately 65 kilometers in total. Around 40 kilometers would run under Spanish territory. The northern entrance would be located near Vejer de la Frontera.

    The distance between terminal stations would be 42 kilometers, with 38.5 kilometers of actual tunnel length. Of that, 27.7 kilometers would be the submarine section. The deepest point would reach 475 meters, with a minimum rock cover of 175 meters and a maximum gradient of 3%.

    The infrastructure would consist of two independent single-track railway tubes, each with a circular cross-section of 7.90 meters in interior diameter. A central service gallery of 6 meters in diameter would run between them for emergencies and maintenance.

    Cross-passages of 6 meters in diameter would connect the tubes every 340 meters. A Secure Parking Zone would be built at the tunnel’s lowest point, equipped with stop zones, safety areas, intervention zones, and a smoke extraction gallery.

    SECEGSA commissioned a feasibility study from Herrenknecht Ibérica, the Spanish subsidiary of the German tunneling machinery manufacturer. The study focused on whether it is technically possible to bore through the Umbral de Camarinal, an underwater ridge separating the Mediterranean Sea from the Atlantic Ocean.

    The conclusion was positive. Herrenknecht confirmed the project is technically viable within current engineering limits, though it warned the execution would involve enormous logistical and economic challenges.

    The subsurface beneath Camarinal consists of Flysch Complex materials, with layers of sandstone and clay of turbiditic origin, topped by more recent Pliocene and Quaternary deposits. This geological layering creates zones with highly variable behavior, even over short distances, making it one of the most demanding sections of the route.

    Cost, timeline, and completion estimates

    The estimated cost exceeds €8.5 billion for the Spanish side alone. If completed, the tunnel would allow the crossing between Spain and Morocco in approximately 30 minutes. The completion horizon is estimated between 2035 and 2040.

    The memorandum sets the framework for three years of study on seismic activity, potential earthquakes and tsunamis, and the geodynamic behavior of the strait.

    Spain’s National Geographic Institute notes that the Iberian Peninsula sits at the contact zone between tectonic plates, with the Azores-Gibraltar-Tunis fracture forming part of that framework – the same zone that produced the devastating 1755 earthquake. 

    If the findings are favorable, excavation of a reconnaissance gallery could be approved. The initial tender for that phase could take place in 2027. Completing it would require between six and nine years.

    A marine research campaign is scheduled before the end of the first half of 2026. The campaign, commissioned to Spain’s Superior Council of Scientific Research (CSIC) with a budget of €553,187.38, was published in the Official State Gazette.

    It will last approximately 15 days and include high-resolution bathymetry using multibeam echosounders, sub-bottom profiler analysis, seabed sediment and rock sampling, and laboratory testing with scientific interpretation.

    Spain’s CSIC will carry out the campaign through three specialized institutes: the Institute of Marine Sciences, the Geological and Mining Institute of Spain, and the Spanish Institute of Oceanography. The Navy’s Hydrographic Institute and the United States Geological Survey are also participating as part of an international working group.

    The strait itself presents additional constraints. More than 100,000 vessels transit it annually, and the research area falls within a Special Conservation Zone with an orca protection plan in place. Over 1,900 marine flora and fauna species have been recorded in these waters, requiring strict environmental permits and oversight.

    All collected data will be integrated into a three-dimensional geological model of the Umbral de Camarinal. This model is considered essential for evaluating the technical viability of the tunnel before any construction begins.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous ArticleAkhannouch Says Morocco on Track to Create Over 1 Million Jobs by End of 2026
    Next Article FIFA’s Snub of Jacques Ndala Is Tacit Vindication of Morocco in AFCON Controversy

    Related Posts

    Financial News

    Morocco’s Parliament Opens Spring Session Ahead of Elections, Government Review

    April 11, 2026
    Financial News

    CAF Faces Renewed Scrutiny as Fresh Doubts Emerge over AFCON Final

    April 10, 2026
    Financial News

    Morocco’s Aromatic Plants Sector Shows Signs of Recovery After Years of Drought

    April 10, 2026
    Top Posts

    How Google Gemini Helps Crypto Traders Filter Signals From Noise

    August 8, 202524 Views

    DeFi Soars with Tokenized Stocks, But User Activity Shifts to NFTs

    August 9, 202522 Views

    DC facing $20 million security funding cut despite Trump complaints of US capital crime

    August 8, 202521 Views
    News Categories
    • AgriFood (184)
    • Financial News (1,761)
    • Industry & Technologies (1,553)
    • Moroccan News (1,796)
    • Sports (1,314)
    Most Popular

    Marseille Coach Gives Update on Aguerd Ahead of Monaco Match

    April 5, 20265 Views

    Morocco Launches $10.8 Million Milk Unit to Boost Agri-Food Industry

    April 5, 20265 Views

    Morocco’s Cultural Creative Industries Remain Underfinanced Despite Growth Potential

    April 10, 20263 Views
    Our Picks

    Fantasy football buzz: Purdy, McCaffrey and Kittle deliver big on “Monday Night Football”

    December 23, 2025

    Russia Blocks Entry of Moroccan Tomato Batch Over Alleged Virus Detection

    December 26, 2025

    Benatia Resigns as Marseille Sporting Director Amid Club Turmoil

    February 15, 2026

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    • Home
    • About Us
    • Privacy Policy
    © 2026 21stNews. All rights reserved.

    Type above and press Enter to search. Press Esc to cancel.

    Go to mobile version